ASK CHATTER - SHOWER REPLACEMENT SCOPE WORKSHEET Planning notes only. Installer verifies final measurements and product compatibility. Guide: https://askchatter.com/guides/shower-replacement-vs-bathroom-remodel/#measurements Priorities: Fixtures/finishes to retain: Base, walls and door to replace: Visible concerns and photos available: Approximate dimensions (identify surfaces; NOT ordering dimensions): Final measurements to be verified by / at what stage: Selected base / wall system / door model and guide revision: Door operation and usable entry confirmed by installer: Nearby fixtures and clearance questions: Drain / valve / showerhead work included: Attachment and concealed conditions to assess: Finish repairs included or excluded: Who approves dimensions and orders products: How incorrect fit would be handled: Allowances and unresolved selections: Separate costs / exclusions: Revised written proposal requested / received: Do not dismantle finishes or glass to fill this out. Leave unknowns unresolved until assessed. Keep the approved proposal and product documents with these notes.